Bagster Day

With the work we did pulling up the floor in the main hall, we had to do something with all that debris. Hence my day today: cutting up the super long boards, and packing as much as I could into a Bagster.

Set up a small staging area in the driveway, to cut anything too long down to size.

A lot of the debris from yesterday.

I was wondering if I needed to break out a second Bagster, but was able to get everything into one. Definitely packed this one up pretty well.

Related:
Main Hall Floor Demo
I’m Seeing Double Here: Four Bagsters!
Long Demo Day

This Post Has 0 Comments

Leave A Reply