Back Office Floor Demo, Continued
Ended up working in the back office today. I put down one 4×8 sheet of plywood down previously, and was working to pull up some more floorboards to get down a second.
Got a lot of practice, walking over floor joists. It’s been a while, but I feel like my “sea legs” come back fairly quickly.
A second bloard down (view from the doorway).
Though it involves a slight step into the room, it’s nice to have a solid area to land on walking into this room.
It’s remarkable how slow this work is. Demo is demo, but today was a pretty slow slog (removing floorboards, pulling up nails, cleaning up any debris that fell down).
For now, the back office is where it needs to be. We’re not quite ready to work on the bathroom area, but we should be set up to remake this back area of the house.
Related:
Back Office Floor Demo Begins
This Post Has 0 Comments