Nothing super glamorous, but still exciting. Today, Liz and I put some time into the front office. With a lot of insulation down in the floor joists, we got to screwing down a first layer of plywood.
Eventually, this will get some self-leveling cement, and then another layer of plywood (the floor sinks something serious, in the NW corner). For a bit of insight into this process, check out some of the work we did on the first floor previously.
Slowly making progress. Goal is to get an actual floor down over this entire room, giving us room to stand and work as we put up the drywall.