July 11, 2014
Down in the basement, I got to see what our plumber had been up to. He’s successfully replaced our lead pipe, and things are markedly less dangerous/unstable. We were originally going to have to freeze the pipe to work on it, but he was able to do it without the freezing (and ended up saving us a few hundred dollars, as a result).
Read More...
July 6, 2014
Long day of basement work with Bob today. Though Liz and I did some work yesterday, we still had tons to do today.
Read More...
July 5, 2014
Our plan is to fill the area back in once we’re done working with the pipes, so we’re keeping all the dirt/sand nearby in a pile. Seems a little odd, but no sense in hauling this all outside when we’d have to haul it all back in again.
Read More...
June 28, 2014
Today, Liz and I decided to brave some basement demo on our own. We talked a bit over the last week, in terms of us trying to take on more tasks ourselves. Even though we love Bob’s help, we found ourselves wanting to try to do more by ourselves.
Read More...
June 14, 2014
For now, we’re in good shape with a lot of the area cleared away from the main waste pipe for the plumber to investigate. We’ll be looking to see if we can relocate this pipe closer to the wall, giving us a lot more walking room between the main basement and the back area.
Read More...
June 11, 2014
Over the weekend, Bob and I opened up a part of the basement walls to take a look at the studs there. We’re planning on putting in an injector pump behind this large waste pipe. And if all goes well… we might even end up routing the waste pipe so that it’s not smack dab in the middle of the walkway here.
Read More...
May 28, 2014
While we were planning, Liz had suited up in her work clothes and was tackling cleaning the basement area (below where we and been working all week, on the kitchen). It was a mess down there, but she really cleared the space up well!
Read More...
January 20, 2014
Bob arrived at the house early today, and had all the concrete for the water heater pretty much poured in place by the time I arrived. As we were waiting around for the concrete to dry a bit more, we decided to tackle an area/opening for some future ductwork. Here he is, using a sawzall to clear out some additional room.
Read More...