Small Visqueen Night

Though we were both pretty tired by the end of the work day on Monday, Liz and I decided we needed to stick to our schedule. We had a really busy and full (and productive) work day on Sunday. But in our push to get things done before Winter arrives, we decided to suit up and put in a little more time, Monday evening.

Read More...

A Big Work Day in the Basement

Though we didn’t get started on the house until around 1PM on Sunday, Liz and I had an incredibly productive afternoon. We’ve been putting in a lot of hours towards the house, but today was really something – as far as all the tasks we got completed.

Read More...

Basement Drywall Night

These photos are from last night, when we kind of combined tasks. While I was out doing laundry, Liz was home prepping drywall. When I got back, I went down to the basement and pitched in – helping to install the pieces that Liz had measured and cut on her own.

Read More...

House Night: Visqueen in the Basement

Monday night house night! After work, Liz and I suited up to go work in the basement for a bit. Our goal was to get Visqueen up on a good many of the walls, focusing on the south side of the house – in the back and the front basement.

Read More...

Basement Cleanup and a Trip Under the Porch

Earlier this week, I spent some nights moving out a lot of things from the basement up to the office on the second floor. With all our boxes cleared out, the office is going to be our next staging area. For now though, so that we can get the basement floor epoxied… we need to clear out as much as we possibly can. I got a lot of the bigger items moved up during the week, and today spent a good deal of time cleaning things up and throwing things out.

Read More...

Pouring a Housekeeping Pad in the Back Basement

Last night, Bob came over to do the cement pour in our back basement. Our goal was to have a small housekeeping pad for the (future) washer/dryer. We wanted to get it done over the weekend, but time got away from us. Luckily for us, Bob was willing to tackle it on a school night.

Read More...

Prep Work for the Housekeeping Pad

We’ll be doing a small housekeeping pad, for the washer and dryer. And that means… more bags of cement! Seventeen bags, to be exact. The funny thing? When we figured out the final number of bags we’d need, my first thought was “Oh good, that’s not so bad.”

Read More...

Last Plywood and Visqueen in the Back Basement

The whole Visqueen process was way, way easier than I thought it would be. Though it took a while for us to get the plywood installed officially, the Visqueen part went by super quick.

I’m now much less daunted about applying Visqueen and dry wall across the entire basement. I think with a full day, Liz and I could likely power through the rest of the basement.

Read More...

The Big Storage Unit Move

Today was our big move, getting lots of our boxed items transferred from our second floor over to a storage unit. Our goal is clear out our second floor as much as we possibly can, so that we can start to do more significant work on the floor and walls in the master bedroom, guest bedroom, and (eventually) our front office.

Read More...

The Night Before the Storage Unit Move

Tomorrow morning, we have a crew of movers coming over to relocate all our boxes into a storage unit.

It’s part of our larger plan for the second floor, to literally clear out as much as we can… so we can start to do some serious work up here: ripping out the old floor, putting down insulation and conduit, adding new plywood, and also getting some walls set up.

Read More...