April 20, 2017
Tonight, Bob was over and helped us set up a new Craftsman Table Saw we purchased. Additionally, he brought over a replacement for our miter saw, which was working fine… but a piece of errant wood broke off the guard. Thankfully, the warranty we got covered a full replacement – so Bob helped set up both.
Read More...
April 1, 2017
So did you know that you can order paint via Amazon? It’s true. But so far, our experience has been that the act of delivering paint is easier said than done.
Read More...
March 31, 2017
Liz, working with the impact drill.
Read More...
March 26, 2017
Since we’re working on getting new stairs down to the basement, we decided to also start working on the first floor bathroom again. Part of that work involved removing the old door that opened into the basement.
Read More...
March 23, 2017
Bob was over a few nights ago, helping us get the last bit of plywood up along the wall (by where our basement stairs will go). That said, he was off doing his own measurements for the stairs while Liz and I measured and cut the plywood for the last remaining section.
Read More...
March 11, 2017
With the space behind the stairs cleared up, Liz finished her measuring. With all the lines in place, I cut the board with a circular saw, and Liz came in afterwards to do some cleanup work with the multitool.
Read More...
March 8, 2017
Liz and I spent time tonight working Bob in the basement. We had him assess our work from Saturday, and he showed us how (and why) our measurements resulted in a board that didn’t quite sit right when we tried to dry fit it. While our measurements were quite accurate… we made the assumption that the top of the wall…
Read More...
March 4, 2017
Once we got done with our cleanup (removing a lot of trash, doing a quick pass with our shop vac), we worked on cutting up some plywood to continue strengthening up the walls.
Read More...
March 1, 2017
After work, Liz and I suited up and headed to the basement. I have to tell you – it was not an easy or pleasant thing, to keep that momentum going. The last thing I want to do after a day of work is to come home… and then do more work.
Read More...
February 16, 2017
Everything else mostly fell into place after that, though it was a bit slow going. The first set of measurements took a while, as Liz and I talked through the logic of what needed to be recorded, and how those lines translated over to the plywood.
Read More...
February 11, 2017
The board, cut to fit along the studs, with a 30 degree taper at the base, as well as notches for the electrical outlet and floor joists.
Read More...
February 5, 2017
The big cement pour was a large step for us, and the stairs will allow us to start to bring down boxes from the second floor. We’ll have to clear out more space in the basement, but the eventual goal is to relocate most (if not all) of our “things” on the second floor, down to the basement.
Read More...
February 2, 2017
After work today, Liz and I went in the basement to clear up some of the debris that accumulated during Liz’s solo run a few days ago. She had put most of the demo debris in bags, and continued clearing out the space above where the stairs will go. For my part, I started hauling out bags of trash and drywall.
Read More...
January 31, 2017
I came home around 7:30PM, and on opening the door heard all sorts of banging and crashing from the basement. When I opened the door to the first floor bathroom (which also leads to the basement), I saw this.
Read More...
January 28, 2017
After a very busy week involving us getting 45 bags of cement, setting up a new support beam, and cutting/prepping the pit… the big day finally arrived. Our final basement pour, which will give us a whole, solid floor again. Something we haven’t had in quite some time.
Read More...