Bagster Cleanup Begins

All of the debris from the back porch repair was relocated over into this space, along the side of the house. It’s been a bit of time since that work, and it’s mostly just sat here… waiting.
Waiting until today that is. I’ve got a Bagster bag at the ready, and was holding off blocking off the driveway until now. Because despite all this debris, there’s going to be even more of it in a day or so.

Getting the bag started.

Trying to sort out all the piles of varying lengths, to make better use of the limited space in the Bagster.

When the kids were working on cutting up the old deck boards, they were supposed to cut each board down to be 8′ or less.
A note from Quality Control: they did not do this job consistently well.

All of the debris from the old deck, neatly stacked. Bagster halfway filled, with the second half still to go.
Related:
Repairing the Back Deck, Day 3
Repairing the Back Deck, Day 2
Repairing the Back Deck, Day 1
This Post Has 0 Comments