Custom Nailer

Tonight, Liz had a solo evening in the office. She suited up after work, and was up and down the stairs a lot (refining a piece of wood on the chop saw, in the basement).
During her demo of the space in front of the fireplace, she put in a lot of supporting pieces (to bring the area flush with the floor joists). During this time, she realized that there was a gap in the far corner, behind the fireplace.
If we put down a piece of plywood, there would be nothing to nail in that corner. So she set about measuring and notching a piece to span between the floor joists, we we had a place to nail to.
Sometimes you get things done. And other times, you get things prepped so you can get things done. Even though we she didn’t get any flooring down, this still counts as work.
Related:
More Floors
Liz: Office Floor Demo
Office Floor Work
This Post Has 0 Comments