More Packing, Adding Spar Varnish to the Doors

Relocated some flooring boards into the front office.

Cleared out this room, to make way for a late appointment with our drywallers. They were able to squeeze us in, so we had to scramble and clear out this room. On the left, we previously had several stacks of flooring. And straight ahead was where my work desk was located.

A small bit of metal, in the walk-in closet. A really nice bonus, from the chimney/masons who redid our chimney – they removed this big cast iron pipe that was venting out through the roof.

With this guy removed, the last bit of our walk-in closet can be drywalled.

Liz, looking over her work on the doors.

Liz, admiring the doors.

The wood, looking good – with all the glass panels, protected.

Liz, showing how slick the doors are.

Front door view.

Double door view.

Upstairs porch door view.

The front door – just huge and colossal. And looking better with each day.

Related:
Double Door Spray
Double Door Prep
Flooring Delivery, and the Beginning of the Door Work

This Post Has 0 Comments

Leave A Reply